Orientation: Install following the arrow direction on the back of the tile to ensure consistent pattern alignment.
Grout Lines (Joints): It is recommended to use cross spacers or leveling wedges to maintain a 2-3mm gap. This is a mandatory requirement to provide space for thermal expansion, preventing tile buckling (popping) during hot weather.
Flatness: Check the substrate thoroughly and use leveling wedges to ensure the finished surface is perfectly flat.
Finishing: Clean all dust and debris from the joints before grouting to ensure optimal adhesion. Strictly avoid walking on the floor while the adhesive is curing.